A supplier due diligence workbook for comparing evidence, project fit, testing, documentation and long-term support.
A reliable dry ice equipment supplier should be evaluated across the complete project, not only by machine price or a polished brochure. The buyer should confirm the real product range, technical data, customization capability, factory evidence, pre-shipment testing, documentation, spare parts, after-sales support and commercial terms before comparing final quotations. The strongest supplier is not automatically the company with the longest catalogue; it is the company that can show clear evidence for the equipment and service scope your project actually needs.
This matters even more when one project combines a dry ice production machine, a dry ice packaging machine, dry ice storage boxes and an upstream carbon dioxide storage tank. Those items must work as a system. A supplier who understands only one component may still leave the buyer to solve interfaces, capacity matching, layout and service coordination alone.
OLLITAL currently presents dry ice blasting, production, packaging, storage and CO2 handling equipment on the same website. Review the current OLLITAL dry ice equipment overview and the dry ice production machine range before comparing individual models.
Supplier evaluation becomes much easier when the buyer defines the project first. If the RFQ only says “send your best dry ice machine,” every supplier can respond with a different product, capacity and commercial assumption. The quotations may look comparable, but they are not based on the same job.
A better procurement brief states the intended application, required dry ice form, expected hourly or daily output, available liquid CO2 supply, electrical requirements, packaging plan, storage requirement, installation country, desired delivery schedule and whether the buyer expects supplier support for commissioning or operator training. That one page of information turns a general inquiry into a real engineering comparison.
For a production project, also state whether the plant will make pellets, blocks or both; whether finished product will be packed automatically; and how much short-term buffer storage is needed. If cleaning equipment is part of the same purchase, provide the cleaning application and compressed-air conditions separately rather than mixing production and blasting requirements into one generic specification.
A scorecard keeps the purchasing discussion focused. Instead of asking “Do you have good quality?” ask for evidence. Instead of asking “Can you customize?” ask what changes are possible, which drawings will be confirmed and how those changes affect lead time, testing and spare parts. The categories below are useful because they can be applied to production machines, packaging systems, storage products and CO2 equipment without forcing every product into the same technical checklist.

Supplier due diligence scorecard: compare technical evidence, factory capability, FAT, documentation, service and commercial execution.
The first question is whether the supplier can describe the exact product being quoted. A dry ice production machine quotation should identify the model, rated output, supported pellet sizes or block format, required utilities, dimensions, weight and other project-relevant data. Public website data can be useful for preliminary comparison, but the final quotation should clearly identify which configuration is actually offered.
OLLITAL’s current 250KG/H dry ice pellet production machine page, for example, publishes output, pellet specification, density, a liquid-to-solid CO2 conversion reference, power, weight and dimensions, while also stating that equipment parameters are continuously updated and actual parameters should be confirmed. That is the right way to use public product pages: as a comparison reference, not as a substitute for the final technical confirmation.
Current reference: 250KG/H Dry Ice Pellet Production Machine
A buyer does not need to demand theatrical factory tours from every supplier, but the supplier should be able to show credible factory evidence that matches the claimed business. Useful evidence includes current prduction-area photographs or video, assembly and test areas, serial or project records, quality-control procedures and examples of finished equipment being prepared for shipment.
OLLITAL’s current About page describes its own factory, customized production, engineering support, global export services and a service process that runs from project communication and design confirmation through production, delivery acceptance and after-sales service. Those claims are useful starting points for due diligence, but a buyer can still ask for project-specific proof such as a live video inspection, current production images or a test record for the quoted configuration.
Company reference: About OLLITAL
Customization should be defined narrowly. A supplier saying “OEM/ODM available” does not tell the buyer whether the change involves voltage, plug, controls, dimensions, outlet arrangement, packaging interface, tank connection, software language, labels or a completely new mechanical design. Each requested change should appear in the quotation or confirmed drawing.
For dry ice production projects, the most useful customization discussion is often about interfaces: what liquid CO2 connection is required, where finished dry ice leaves the machine, how the machine connects to a conveyor or packaging system, and how much service space is needed. For packaging, the film width, bag range, sealing form, air supply and additional functions need the same treatment. The current OLLITAL horizontal automatic packaging page lists model-dependent bag and film ranges and notes that non-standard products can be customized; the final project should still lock those details in writing.
Packaging reference: Horizontal Automatic Packaging Machine
A supplier becomes more valuable when the product families fit together logically. This does not mean every component must be purchased from one company. It means the supplier should understand what happens before and after its equipment. A production-machine supplier should know that liquid CO2 delivery, packaging, storage and dispatch can become constraints. A packaging supplier should understand the output form and flow from the production machine. A storage supplier should know the intended product form and handling pattern.
The current OLLITAL site groups dry ice production machines, packaging machines, storage boxes and carbon dioxide storage tanks as connected equipment categories. That range can simplify project communication, but the buyer should still verify each interface. “One-stop supplier” is useful only when the engineering and documentation really connect the equipment.
| System Area | Evidence to Request | Interface to Confirm | Why It Matters |
|---|---|---|---|
| Liquid CO2 supply | Tank data, connection details, supply conditions | Tank/piping to production machine | Unstable upstream supply can limit production |
| Dry ice production | Model, capacity, pellet/block specification, utilities | Discharge to collection/packaging | Defines usable production output |
| Packaging | Bag/film range, throughput, utilities, control functions | Production feed to packaging | Prevents downstream bottlenecks |
| Storage | Capacity, material, dimensions, handling method | Packaging/dispatch workflow | Controls buffer and movement |
| After-sales | Manuals, spares list, response process, training scope | Customer maintenance team | Determines long-term supportability |
Product appearance is not a cosmetic detail when it reveals configuration differences. The buyer should be able to match the quoted model to current photographs, drawings or video of the real machine. Control-panel arrangement, discharge direction, connection position, enclosure size, wheels or supports and auxiliary modules can change between capacities and project configurations. A generic photo should not silently become proof that every quoted capacity uses the same cabinet or layout.
| Actual Product EvidenceUse current product photographs, drawings and videos for the quoted model.Confirm control layout, discharge direction, connections and auxiliary modules.Do not assume one image represents every capacity or customized configuration.Record the final accepted drawing or photo set with the order. |
Example of a current OLLITAL product photograph used as evidence. Final appearance should be confirmed for the exact quoted model and project configuration.
A factory acceptance test is useful when it proves the functions that matter to the buyer. It should not become a ceremonial video of the machine switching on. The FAT plan should identify the configuration being tested, utilities used, product or media used, test duration, acceptance points, accessories included and the evidence that will be supplied before shipment.
For a dry ice production machine, the FAT may include controls, alarms, startup sequence, dry ice output, pellet appearance, die or size configuration, discharge behavior and agreed operating stability. For a packaging line, the test should include the relevant film or bag format, conveying, filling or measuring, sealing and output. For a storage product, the useful evidence is different: materials, dimensions, hardware and handling configuration may matter more than a powered test.
If the buyer cannot attend in person, request a structured remote witness instead of a generic factory video. Ask the supplier to show the model plate or project identifier, the agreed configuration, the test sequence and the result. A short written FAT record can save significant time later because it creates a shared baseline before the equipment leaves the factory.
Technical documentation is not paperwork added after production; it is part of the purchased system. The buyer should know which documents are included before the order is signed. Depending on the equipment, that may include an operation manual, electrical diagram, connection drawing, spare-parts list, maintenance guidance, packing list, test record and project-specific layout drawing.
For customized equipment, the buyer should also confirm whether the final drawings will reflect the delivered configuration. A manual that describes a standard machine but ignores customized connections, sensors or controls is less useful. The final document set should help the installation and maintenance team identify what is actually on site.
Documentation also makes after-sales communication faster. When a service request includes the exact model, serial information, drawing reference, component photo and symptom description, the supplier can usually identify the issue more efficiently than when the request contains only “machine not working.”
Spare parts should be discussed before a failure, not after it. Ask which components are considered normal wear or recommended stock, which parts are model-specific, what identification information is needed for reordering and how international delivery is handled. The objective is not to buy a large box of parts immediately; it is to understand which items could stop production and how quickly they can be replaced.
OLLITAL’s current About page states that spare parts can be ordered through the website or customer service and describes a one-year warranty with replacement of eligible non-human-damaged parts and technical support. Buyers should confirm the final warranty wording, exclusions, response process and spare-parts scope in the commercial documents for their specific order rather than relying only on a website FAQ.
After-sales support is also broader than warranty. Training, troubleshooting, parameter guidance, replacement-part identification, documentation updates and commissioning assistance can all affect the useful life of the equipment. The buyer should know how support is delivered: email, video call, remote access where applicable, or on-site service if separately agreed.
Technical and commercial comparisons should be connected. A low quoted price can become expensive if the offer excludes important accessories, testing, documentation, packing, freight preparation or installation support that another supplier included. Compare the same scope before comparing the final number.
At minimum, align the equipment model, included accessories, electrical configuration, customization, testing scope, packing method, delivery basis, lead time, payment terms, warranty and spare-parts package. If one quotation includes only the base machine and another includes a conveyor, packaging interface or storage boxes, the price difference is not a supplier-performance difference; it is a scope difference.
For international equipment purchases, packing and shipment preparation deserve explicit confirmation. The buyer should know what is packed separately, which items require reassembly, how accessories are identified, and which documents are supplied with the shipment. These details are small before dispatch and expensive after arrival if they are unclear.
The simplest way to improve supplier comparison is to send every candidate the same RFQ. That creates comparable technical and commercial responses and reduces the temptation to judge suppliers on how many features they can add to an unclear request.
Application and final dry ice form: pellet size, block format or cleaning use.
Peak and normal production demand, plus practical production hours per day.
Available liquid CO2 supply conditions and whether a storage tank is already installed.
Required voltage, frequency, plug or connection standards and installation country.
Packaging requirement: bag size, film material, target throughput and coding/label needs.
Storage and handling requirement: point-of-use, route staging, central buffer or shipping.
Available floor space, access restrictions and required service clearances.
Required customization, language, controls, interfaces or branding.
FAT / pre-shipment test expectations and evidence required before shipment.
Documentation, spare-parts, training and commissioning support expected.
Target delivery date and the commercial delivery basis to be quoted.
The supplier cannot identify the exact model or configuration being quoted.
The quotation uses one generic machine photo for multiple capacities without drawings or clarification.
Key utility requirements are missing or described only after the order discussion is advanced.
Customization is promised verbally but does not appear in the quotation or drawing.
FAT is described only as “machine tested” without defined test items or evidence.
The spare-parts process depends on guessing component identity from a generic product name.
The warranty sounds broad but exclusions, response method and responsibilities are not written.
Packing, delivery basis or included accessories are unclear enough that supplier prices cannot be compared directly.
The current OLLITAL dry ice website presents a broad product range rather than a single equipment category. Production equipment includes pellet and block machines across multiple output classes. Packaging products include horizontal and vacuum packaging systems. Storage includes 50 kg and 270 kg insulated boxes, while the CO2 category covers cryogenic storage solutions. That breadth is useful when the buyer wants one project discussion to include multiple parts of the dry ice workflow.
For example, the current 50 kg storage box page lists PE rotomolding plus PU foaming, 60 L usable volume and a nominal 50 kg capacity for 3 mm granular dry ice. The current 270 kg page lists 330 L usable volume and a nominal 270 kg capacity for 3 mm granular dry ice. These public values help the buyer compare storage roles, but the final project should still confirm how many containers are needed, how they will be moved and where they sit in the packaging and dispatch workflow.
Storage references: 50 kg Dry Ice Storage Box | 270 kg Large Capacity Dry Ice Storage Box
The current carbon dioxide storage category also lists cryogenic CO2 storage solutions and describes vacuum insulation, level indication, pressure regulation and safety-valve functions. Because tank sizing depends on actual demand, refill logistics and project conditions, the buyer should treat category information as a starting point and request project-specific engineering confirmation.
CO2 system reference: Carbon Dioxide Storage Tank Category
A final decision should separate must-have requirements from preferences. Safety-critical requirements, capacity, utilities, core configuration and mandatory documentation belong in the must-have group. Optional convenience features, cosmetic details or future accessories can be scored separately. This prevents a supplier from winning the comparison with attractive extras while missing a fundamental project requirement.
A practical scoring method is simple: mark each requirement as Verified, Needs Clarification or Not Confirmed. Do not give full credit for a sales statement when the project requires documentary or test evidence. Then review the unresolved items before contract signature. If a critical requirement remains unclear, convert it into a written contract condition, drawing note, test item or delivery document.
The result is not a universal “best supplier” ranking. It is a project-specific evidence record that shows which supplier can satisfy the exact technical, commercial and support requirements of the purchase.
Should I choose a manufacturer only because it has the lowest price?
No. Compare the complete scope first: equipment configuration, utilities, testing, documentation, accessories, packing, warranty, spare parts and support. A lower base price may not represent a lower project cost.
What proof should I request before placing an order?
Request the exact model or configuration, current product photos or video, technical data, confirmed drawings where relevant, factory or company evidence, the pre-shipment test scope, commercial terms and the final document list.
Is a factory video enough to verify a supplier?
A factory video is useful evidence, but it does not replace project-specific technical confirmation. Match the factory evidence with the quoted model, drawings, test plan, documents and commercial scope.
What should be included in a FAT for a dry ice production machine?
The final FAT should reflect the purchase. Typical items can include controls, alarms, startup, output, pellet form, discharge, operating stability and agreed accessories, but the actual criteria should be written for the quoted configuration.
How do I compare suppliers offering different machine capacities?
First normalize the requirement. Give every supplier the same peak demand, production hours, pellet or block specification, liquid CO2 conditions, packaging plan and installation constraints. Then compare which configuration meets that same scenario.
Should packaging and storage be evaluated with the production machine?
Yes when they are part of the same workflow. A high-output production machine can create a bottleneck if packaging, temporary storage or dispatch cannot remove product at a compatible rate.
How much spare parts stock should I buy?
There is no universal quantity. Ask the supplier which items are normal wear, which are critical to uptime, their lead times and how parts are identified. Build stock around your production criticality and delivery time.
What should I confirm about after-sales service?
Confirm the warranty wording, technical-support method, response process, training scope, spare-parts ordering method, documentation supplied and whether commissioning or on-site support is included or separately quoted.
Choosing a dry ice equipment supplier is easier when the decision is built around evidence. Define the project first, send a consistent RFQ, confirm the exact product configuration, verify factory and testing capability, lock customization into drawings, review documentation and spare parts, and compare commercial terms on the same scope. That process protects the buyer from the two most common problems in industrial equipment purchasing: comparing unlike quotations and discovering missing details only after the machine has shipped.
For multi-equipment projects, the supplier should also show that the dry ice production machine, packaging equipment, storage solution and CO2 supply arrangement can be discussed as one workflow. The best procurement result is not the most impressive catalogue. It is a clear, supportable project that arrives with the right configuration, the right documents and a practical path for long-term operation.
Review the current OLLITAL dry ice equipment range and About OLLITAL before preparing your project-specific RFQ.
Preparing a supplier comparison for a dry ice project?
Prepare your target output, dry ice form, liquid CO2 conditions, packaging and storage plan, installation country, utility information and expected delivery schedule. A structured requirement makes it easier to compare equipment and support on the same basis.